![]() |
This long trench contains the supply line that connects the pump chamber to the four subsystems (in background). |
![]() |
Connecting the supply line to the subsystem manifolds. |
![]() |
A slide taken while the laterals are being connected to the manifolds. |
![]() |
Installing the subsystem laterals and the monitoring and sampling wells. |
![]() |
Covering the laterals and gravels with mirafi cloth prior to trench closure. |
![]() |
The completed site showing the four subsystems with monitoring and sampling wells installed. |