Restoration Log for the month of January, 1999
Date: 1/10/99
Workers:Chris Shelton, Jeff Shelton, Gary Gillman, Jamie Hurst
Work Completed:
- Removed body from frame
Time:
- 5 Hours
Date: 1/16/99
Workers:Chris Shelton, Jeff Shelton, Sylvia Shelton
Work Completed:
- Wire Brushed some test areas of the frame.
- Removed front bumper braces (2 bolts each side of frame)
- Removed electrical and brake housing
- Removed brake cylinder and brake pedal
- Removed bumper stops frome frame. (Rear leaf stops. 4 3/8" bolts per unit X 2)
- Sanded passenger side frame rail and 1/2 of Drive shaft support brace and some of the transmission brace.
Time
- 8 Hours
Purchases:
- Wire Brush wheel for 41/2 inch grinder, $12.00
Pictures: Click on thumbnail to see full-size picture
Date: 1/18/99
Workers:Chris Shelton
Work Completed:
- More Sanding on frame
Time
- 2 Hours
Purchases:
- Wire Brush for grinder, $12.00
Date: 1/20/99
Workers:Chris Shelton
Work Completed:
- More Sanding on frame
Time
- 1 Hours
Date: 1/27/99
Workers:Chris Shelton
Work Completed:
- Removed transmission brace (4 9/16" bolts per side)
- Rmoved forward exhaust hanger. (1 bolt to bottom of frame, 1 sheet metal screw)
Mounts in front of rear shock mounts on frame)
- Removed rear exhaust hanger. (2 sheet metal screws)
Mounts to very back of pass. side frame)
-Removed gas tank
Time
- 4 Hours
Date: 1/27/99
Workers:Chris Shelton
Work Completed:
- Continued Sanding Frame
- Filled hood support holes and 1 coat primer on underside.
- Sanded/primed both front and rear exhaust hangers.
- Re-sanded and 1 coat primer on one of the seat back peices
Time
- 6.5 Hours
Purchases:
- Wire Brush for grinder, sanding pads for palm sander and grinder, new pair saftey glasses and new dust masks, $ 40.00
Return to Studebaker Restoration page:
View logs of:
April 98
May 98
June 98
July 98
August 98
September 98
October 98
November 98
December 98
January 99
February 99
March 99
April 99
May 99
June 99
|